JAUK were instructed by Scotscape to remove the existing railings and gates installed insitu. These railing and gates were heaving painted and badly damaged.
JAUK brought these railings and gates back to our JACK HQ in North London to shotblast and repowder coat using the two coat zinc primer system.
We then returned to site and installed leaving the railing and gates looking new.
All shot blasting and powder coating was completed in our very own blast room in North London factory as always by our PAYE staff.
Project length 1 – 2 weeks.
Project value circa £20k